August, 27. 2006

Zeitrechnung

“The first 90% of a project takes 90% of the time, the last 10% takes the other 90% of the time”

via

Permalink • drucken • Spuren im Schnee [Kommentare]

Trackback uri

http://mafia-server.net/blog/zeitrechnung/trackback/

Leave a comment